Why Choose Conquip...
Shard of Glass, London
Conquip and CantiDeck have been involved at an early stage on what will be Europe's tallest skyscraper and one of London's key landmarks and tourist attraction
Tunnel Segment Lifting Beam
Conquip were approached by Costain/ 4D JV to produce a lifting beam for moving and placing tunnel lining segments.The brief was to increase operational efficiency and safety
6000L Boat Skip - Thames Water Ring Main Shaft Excavation
Morgan est faced a constant challenge owing to the excessive weight of the London Clay being excavated, compounded by a safety hazard when manually discharging a full skip. Time on this project was at a premium so Morgan est needed to find a solution...and quickly...
JCB 1m3 capacity - A681 Cloughfoot
Bentley needed a quick response to massive problem during their project on the A681. They had the JCB but no bucket to do the job.
3000L Concrete Column Skip - Great West Quarter, Brentford
J Reddington was looking for a product that was rugged in construction, durable, had 3000 Litre capacity yet was easy to control and safe to do the job
.
Stretcher Cage - Multiple Site H&S Requirement
M J Gallagher wanted something a little special that would enter at floor level, with an entry on solid ground rather than flush to the building together with room for medical support to be moved
That's what makes Conquip Industrial a special company to do business with, a team of experts that can advise, help and support you all the way...